Made a simple change to the Scatter Plot graphs today. Any measurement greater than 180 seconds (3 minutes) is flagged as an error in this view.
Why?
Thank PodTech. Som of their measurements were coming in at an insane 500 seconds plus this morning, and my graphing package couldn’t handle the scaling of data between 0.5 and 1400 seconds.
Technorati Tags: , ,